Gilbert Stream Realignment.

  • DN750 pipeline realignment

  • Steep sided and deep creek & gully crossing

  • 13,000m3 cut and fill

  • 54m long 2m diameter curved culvert

  • All pipeline bends fabricated off site

  • Complex construction process with machine winching required on most slopes

  • Short pipeline tie in window – required lots of planning

  • Full conceptual and detailed design

  • Construction and commissioning engineering support